August 10, 2016

Just a few quick pics. I had a pre-dry wall meeting today the 10th- I was able to walk through the home with the project manager and they have already started to put in the insulation. Pretty impressive to watch the guy on stilts just walking around insulating- almost cirque du soleil-ish without the music and fancy costumes :)

Wiring is done and HVAC is all set up as well!


Looking out the morning room windows from the kitchen. Insulation almost done.


I think I need a pair of those stilts! They look super fun! Guest bedroom getting insulation.
2nd guest bedroom all insulated


Laundry Room pipes etc


Furnace and Water heater



Plumbing for future basement bathroom and future guest room :)